The gate is complete - Sept 26th

Last Gate Construction Day

Today, Ridge (side) beam tile installation was completed and finishing touches were made to the gate.

IMG_2539 IMG_2540 IMG_2542 IMG_2548 IMG_2558 IMG_2559
IMG_2561 IMG_2563 IMG_2572 IMG_2586 IMG_2590 IMG_2592
IMG_2604 IMG_2607 IMG_2616 IMG_2618 IMG_2632 IMG_2641

The Water Wheel

The Water wheel, the hand made in Japan, was placed just inside the Sunpu Gate.   At far Right, a Lenten with stone path and water feature sits across the path to Mt Fuji from the water Wheel.

IMG_2566 IMG_2567 IMG_2568 IMG_2569 IMG_2607 IMG_2633

Kabulzi Gate

It was installed next to the road in Luaritzen Gardens before I arrive and was painted black later in the day.

IMG_2533 IMG_2565 IMG_2574 IMG_2583 IMG_2601 IMG_2603

Red Torri Gate, Mt Fuji and "Shrine"

Today, Concrete was poured around the base of the Torri Gate and it was painted red. Construction of steps partway up the mini Mt. Fuji was well underway.  Mt Fuji "Shrine" was reinstalled.

IMG_2551 IMG_2553 IMG_2554 IMG_2610 IMG_2611 IMG_2635

The Gate is "Done"

Late Monday, the Sunpu Gate construction is done and all scaffolding was removed. The craftsmanship is Superior!!!

IMG_2642 IMG_2643 IMG_2644 IMG_2645 IMG_2646 IMG_2647

The gate is complete - Sept 26th

Based on Gallery by MINO STUDIO


Return to PhotosSunpu Castle Gate Replica + TimeLine > Omaha > Built > October 1st

Lines below bar and in description links  by Steve R. Adams
Last update on February 8th , 2006 17:30 UTC (11:30 pm CST)