First Lantern & Tile Signing - Sept 23rd

Gate Construction Day 2

Yesterday, Japanese Construction Crew put up the Sunpu Castle Gate Replica's post, beam and side panels. The roof frame construction was started. Today, the roof frame construction is competed and the crew starts the installation of roof tiles on the main "beam" over the gate. Also the doors were fitted and hung. Note all roof tile were neatly laid out on the ground right east of the gate.

IMG_2254 IMG_2257 IMG_2258 IMG_2259 IMG_2262 IMG_2267
IMG_2269 IMG_2270 IMG_2271 IMG_2275 IMG_2280 IMG_2285
IMG_2291 IMG_2293 IMG_2299 IMG_2322 IMG_2329 IMG_2330
IMG_2331 IMG_2334 IMG_2346 IMG_2362 IMG_2369 IMG_2370

Tile Signing "Ceremony"

Early afternoon, before the tiles were installed on the Sunpu Gate, nearly everyone at the Construction site (Japanese Construction Crew and American volunteers) signed a roof tile. Below are various messages written on the underside of tiles in English & Japanese.

IMG_2298 IMG_2301 IMG_2302 IMG_2303 IMG_2304 IMG_2306
IMG_2307 IMG_2308 IMG_2309 IMG_2312 IMG_2313 IMG_2315
IMG_2316 IMG_2317 IMG_2321 IMG_2323 IMG_2324 IMG_2325

First Lantern Installation

It took all afternoon to install the first Lantern - the largest lantern in front and to the left of the Sunpu Gate. It took a crane and much handing plus patience & time to assemble this lantern. Interesting, it took nearly 100 pennies to level and raise it a fraction of an inch off its base.

IMG_2273 IMG_2281 IMG_2282 IMG_2286 IMG_2287 IMG_2289
IMG_2292 IMG_2295 IMG_2297 IMG_2322 This Lantern is
Above and Right
of Sunpu Gate
on map at right
Sunpu Gate Area Map

First Lantern & Tile Signing - Sept 23rd

Based on Gallery by MINO STUDIO


Return to PhotosSunpu Castle Gate Replica + TimeLine > Omaha > Built > September 23rd

Lines below bar and in description links  by Steve R. Adams
Last update on February 8th , 2006 17:30 UTC (11:30 pm CST)